There are many factors that eat ought exist addressed ago this question can exist properly answered. Is the apparatus a erect or horizontal machine? How any axes will exist required? What is the faculty of the implement turret? How are you planning above holding the part? Assuming the programmer has answered these questions though you, lets proceed. though each CNC Milling apparatus construct will exist slightly different, these are the generic steps I pursue above a daily base though a 3 axis erect CNC Milling machine.Note: I am assuming you know some basic machining practices. though example, how ought use an verge finder, how ought navigate along your machine's control, and knowledge of basic CNC lead commands.

.

1) sweep full surfaces, though instance table, vise jaws and isolate identical good with a lint free cloth.
 

2) cargo tools needed. (including verge finder)
 

3) cargo isolate at vise or silent your occupation holding is going ought be.
 


4) put occupation fixture offsets. invent certain the apparatus is using the WFO that the program will exist using. if not, switch ought MDI mode, class at G54, or G55, or G54.1P15, what ever the program will exist using. overcome Cycle Start. Using an verge finder, elect up the X0. place the programmer had previously established. further ought your WFO page and add the machines absolute X evaluate ought the evaluate currently at the WFO's X registry. fulfill the identical though the Y axis.
 


5) put the implement length offset though each implement by loading first implement at spindle. Manually confront the Z axis down until the tool's gift is shut the Z0. place the programmer had previously established. obtain a bit of 0.001" shim stock and include it among the isolate and the gift of the tool. Carefully and lower the Z axis at 0.0001" increments until the shim stock can exist pulled with a lean drag. further ought your implement length offset page and enter the machine's absolute Z evaluate plus -0.001 at the tools registry. cite procedure ought extra tools. Note: -0.001 is added though the shim stock's thickness.
 


6) Enter any diameter offsets that can want ought exist entered if implement radius compensation will exist used at the implement offset page.
 


7) adjust coolant lines so coolant can properly cold tools and wash chips away.
 


8) place apparatus at slow rapid, only block and then periodical Cycle Start. exist careful and scan each block programmed and see each motion the apparatus makes ready ought interval the apparatus at case there are any programming errors. (You could too flow the program 5" or whatever above the isolate ought invent certain each worry is good and use Dry flow if you feel it necessary.)
 
 